Safe Work Procedures (SWP 1–5)

Mildura Shine Co · ABN 72 767 892 925 · MSC-PRO-03 · v1.0 · Issued 23 Jul 2026 · Review: annual or after any incident · Authorised: Owner/Operator

Applies to all SWPs: pre-start powerline/service-drop survey before any pole is raised (carbon conducts — 3m no-go); working-alone check-in active; heat/UV controls Oct–Mar; public protection (cones/signage) where work meets footpaths; incident/complaint handling per MSC-PRO-02.

SWP-1 · Window cleaning — water-fed pole (ground-based)

SWP-2 · Window cleaning — traditional (ground level)

SWP-3 · Gutter cleaning — single-storey (basic ladder access)

SWP-4 · Pressure washing — residential hard surfaces (friction method, chlorine-free)

SWP-5 · Solar panel cleaning — ground-based pure water

Out of scope for all SWPs (declined or referred): any work above single-storey ladder reach that cannot be done by pole from the ground; roof walking; work within 3m of conductors; chlorinated soft-washing. These activate only under the Future Working-at-Heights module with training, equipment and insurance in place first.
Signed: ____________________ Owner/Operator · Date: ____ / ____ / 2026 · Next review: July 2027